West Sole - Field History
- Allocation of block 48/6: September 1964
- Discovery: September 1965
- Signing of Statement of Intent with British Gas: February 1966
- Construction of platform WA and WB and subsea 16-inch pipeline: July 1966
- Construction of terminal: March 1967
- First delivery of North Sea natural gas: March 1967
- Regular contract deliveries to British Gas begin: July 1967
- Single-well production platform WE installed: July 1967 Platform WC installed: August 1969
- Hydrocarbon dewpoint installed: June 1970
- West Sole Supply Agreement: July 1970
- Satellite WAS and drilling of two more wells: August 1974
- Removal of platform WE: September 1978
- Announcement of gas compression project: August 1980
- Completion of 24-inch subsea pipeline from shore to WB: August 1981
- New Westinghouse telemetry system installed: December 1981
- Drilling of new well: January 1982
- Installation of dehydration units platforms WA and WB: June 1982
- Installation of Gas compressors, power generators and ancillary equipment: March 1983
- Completion and commissioning of gas compression project: August 1983
- Production reached 1 trillion cubic feet: March 1984
- Commencement of West Sole modifications project: Summer 1988
- Completion of West Sole modifications project: Winter 1989
- Newsham in production: Spring 1996
- West Sole contract with British Gas terminated: May 1996
PLATFORM STATISTICS
- WA (main) Platform
- Weight at float out (excl. piles): 60 short-tons
- Height of tower section: 38.6m
- Max dimensions of jacket on seabed: 53.3m
Piles
- Total number: 14
- Maximum depth: 22m
Decks
- Total deck loading: 2,000 short-tons
- Dimensions: 62.3m x 21.3m
- Height of deck above lowest sea level: 23.7m
General
- Height from seabed to helideck: 60.4m
- Accommodation: 39
- Drilled depth of wells: 3,573.0m
- Directional drilling max deviation: up to 50 degrees from vertical
- Number of wells: 8
WB Platform
- Weight at float out (excl. piles); 700 short-tons
- Height of tower section: 37.8m
- Max dimensions of jacket on seabed: 40.8m
Piles
- Total number: 24
- Maximum depth: 22m
Decks
- Total deck loading: 2,100 short-tons
- Dimensions: 42.5m x 36.5m
- Clearance of deck above lwest se level: 24.4m
General
- Height from seabed to helideck: 56.8m
- Accommodation: 41
- Drilled depth of wells: 3,089m
- Directional drilling max deviation: up to 50 degrees from vertical
- Number of wells:
WC Platform
- Weight at float out (excl. piles): 750 short-tons
- Height of tower section: 44.2m
- Max dimensions of jacket on seabed: 41.5m
Piles
- Total number: 32
- Maximum depth: 22m
Decks
- Total deck loading: 1,900short-tons
- Dimensions: 42.5m x 36.5m
- Height of deck above lowest sea level: 25.9m
General
- Height from seabed to helideck: 53.2m
- Accommodation: 34
- Drilled depth to wells: 3,695m
- Directional drilling maximum deviation: up to 50 degrees from vertical
- Number of wells: 7
Also see
West Sole - General History
or
download the
West Sole Area Asset Portfolio
(PDF Document).
|